1540 N VINE ST 90028
APPLICATION / PERMIT NUMBER: 13010-10000-00671
PLAN CHECK / JOB NUMBER: B13LA02657

Plan Check and Permit Information


GROUP: Building
TYPE: Bldg-New
SUB-TYPE: Apartment
PRIMARY USE: (5) Apartment
WORK DESCRIPTION: PROPOSED 7 STORY MIXED USE PROJECT. 4 LEVELS OF TYPE IA BASEMENT PARKING, 2 STORIES OF TYPE IA PARKING AND RETAIL (CORE AND SHELL SPACE- TI ON SEPARATE PERMIT), AND 5 STORIES OF TYPE IIIA APARTMENT (287 UNITS) SPRINKLERS BEING USED FOR HEIGHT INCREASE. STAIRS, RAILS (STEEL AND GLASS) ARE DEFERRED.
PERMIT ISSUED: Yes PERMIT ISSUE DATE: 12/24/2013 ISSUING OFFICE: Metro
CURRENT STATUS: CofO Issued CURRENT STATUS DATE: 08/24/2016

Permit Application Status History
Submitted 04/22/2013 APPLICANT
Assigned to Plan Check Engineer 05/02/2013 JOHN VASQUEZ
Corrections Issued 05/07/2013 JOHN VASQUEZ
Quality Review Completed 05/09/2013 CHARLES CHANG
Building Plans Picked Up 05/09/2013 APPLICANT
Applicant returned to address corrections 06/19/2013 JOHN VASQUEZ
Applicant returned to address corrections 09/04/2013 JOHN VASQUEZ
Applicant returned to address corrections 09/06/2013 JOHN VASQUEZ
Applicant returned to address corrections 09/18/2013 JOHN VASQUEZ
Applicant returned to address corrections 09/25/2013 JOHN VASQUEZ
Applicant returned to address corrections 09/26/2013 JOHN VASQUEZ
Applicant returned to address corrections 10/03/2013 JOHN VASQUEZ
Applicant returned to address corrections 10/09/2013 JOHN VASQUEZ
Applicant returned to address corrections 10/24/2013 JOHN VASQUEZ
Plan Check Approved 12/24/2013 JOHN VASQUEZ
Issued 12/24/2013 LADBS
CofO in Progress 08/24/2016 SAKO AGHAZARIAN
CofO Issued 08/24/2016 HAMID PISHEHVAR
Permit Finaled 08/24/2016 HAMID PISHEHVAR

Permit Application Clearance Information
Address approval Cleared 05/16/2013 DAVID CHIN
Driveway location Cleared 05/20/2013 WESTON PRINGLE
Internal circulation Cleared 05/20/2013 WESTON PRINGLE
Historic monument Cleared 07/03/2013 LAMBERT GIESSINGER
Eng Process Fee Ord 176,300 Cleared 07/18/2013 ARMENIA HERNANDEZ
Highway dedication Cleared 07/18/2013 ARMENIA HERNANDEZ
Permit Cleared 07/18/2013 ARMENIA HERNANDEZ
Roof/Waste drainage to street Cleared 07/18/2013 ARMENIA HERNANDEZ
Historical monument Cleared 08/22/2013 JIM URQUHART
Project located in CRA area Cleared 08/22/2013 JIM URQUHART
Sewer availability Cleared 08/22/2013 ARMENIA HERNANDEZ
Building over 3-story or 36-ft Cleared 09/18/2013 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 09/18/2013 CALOSHA APPROVED
Encroachment in public way Cleared 10/07/2013 MEHRDAD EMAMI
Work Adjacent to Public Way Cleared 10/07/2013 MEHRDAD EMAMI
Hydrant and Access approval Cleared 10/09/2013 ROBERT DUFF
Low Impact Development Cleared 10/09/2013 IDA MEISAMI-FARD
Stormwater Pollution Mitigatn Cleared 10/09/2013 IDA MEISAMI-FARD
DAS Clearance Cleared 10/11/2013 JOHN VASQUEZ
Title 19 building approval Cleared 11/14/2013 DAVE MYERS
"Q" conditions Cleared 12/17/2013 BRIDGETTE WOOTEN
"T" removal Cleared 12/17/2013 BRIDGETTE WOOTEN
CPC Cleared 12/17/2013 BRIDGETTE WOOTEN
Green Code Cleared 12/17/2013 ALDO UBAU
Miscellaneous Cleared 12/17/2013 BRIDGETTE WOOTEN
Opn space landscape/Water mgmt Cleared 12/17/2013 BRIDGETTE WOOTEN
Site Plan review Cleared 12/17/2013 BRIDGETTE WOOTEN
Tract Map conditions Cleared 12/17/2013 BRIDGETTE WOOTEN

Licensed Professional/Contractor Information
Architect Information
Olsen, Eric H; Lic. No.: C27721
3802 OSTROM AVE
LONG BEACH, CA  90808
Contractor Information
Bernards Bros Inc; Lic. No.: 302007-B
555 FIRST STREET
SAN FERNANDO, CA  91340
Engineer Information
Gedhada, Rajnikanth; Lic. No.: S5237
15 POPPYFIELD LANE
RANCHO SANTA MARGARITA, CA  92688
Engineer Information
Gilmour, John Patrick; Lic. No.: C73983
6511 WEST 85TH STREET
LOS ANGELES, CA  90045

Inspection Activity Information

Inspector Information
DAVID BURKHEAD, (213) 276-8147
Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspection Request(s)
  No data available

Inspection Request History
  Deputy Steel/Welding   03/19/2014   Approved   JEFF BYTHEWAY
  Deputy Steel/Welding   04/02/2014   Approved   JEFF BYTHEWAY
  Excavation/Setback/Form/Re-Bar   04/22/2014   Partial Approval   JEFF BYTHEWAY
  Footing/Foundation/Slab   04/22/2014   Partial Approval   JEFF BYTHEWAY
  Footing/Foundation/Slab   04/28/2014   Partial Approval   SAKO AGHAZARIAN
  Footing/Foundation/Slab   05/06/2014   Partial Approval   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   05/09/2014   Approved   SAKO AGHAZARIAN
  Footing/Foundation/Slab   05/09/2014   Partial Approval   SAKO AGHAZARIAN
  Green Building Rough   05/19/2014   Not Ready for Inspection   DONALD CRICHLOW
  Reinforced Concrete Frame   05/19/2014   Partial Approval   SAKO AGHAZARIAN
  Verify Sprinkler Sign Off   05/19/2014   Approved   SAKO AGHAZARIAN
  Green Building Rough   05/22/2014   Not Ready for Inspection   DONALD CRICHLOW
  Reinforced Concrete Frame   05/22/2014   Partial Approval   SAKO AGHAZARIAN
  Footing/Foundation/Slab   05/30/2014   Partial Approval   SAKO AGHAZARIAN
  Green Building Rough   05/30/2014   Not Ready for Inspection   DONALD CRICHLOW
  Reinforced Concrete Frame   05/30/2014   Partial Approval   SAKO AGHAZARIAN
  Footing/Foundation/Slab   06/04/2014   Partial Approval   SAKO AGHAZARIAN
  Footing/Foundation/Slab   06/09/2014   Partial Approval   SAKO AGHAZARIAN
  Footing/Foundation/Slab   06/12/2014   Partial Approval   SAKO AGHAZARIAN
  Footing/Foundation/Slab   06/26/2014   Partial Approval   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   07/09/2014   Approved   SAKO AGHAZARIAN
  Footing/Foundation/Slab   07/09/2014   Partial Approval   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   07/10/2014   Approved   SAKO AGHAZARIAN
  Footing/Foundation/Slab   07/14/2014   Partial Approval   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   07/15/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   07/16/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   07/17/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   07/18/2014   Approved   SAKO AGHAZARIAN
  Footing/Foundation/Slab   07/21/2014   Partial Approval   BARRY SILLS
  Deputy Pre-Stress Concrete   07/22/2014   Partial Approval   LESLIE TRUJILLO
  Deputy Reinf. Concrete   07/22/2014   Partial Approval   LESLIE TRUJILLO
  Deputy Shotcrete   07/22/2014   Partial Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   07/23/2014   Conditional Approval   BARRY SILLS
  Deputy Reinf. Concrete   07/23/2014   Conditional Approval   BARRY SILLS
  Deputy Shotcrete   07/23/2014   Conditional Approval   BARRY SILLS
  Footing/Foundation/Slab   07/23/2014   Partial Approval   BARRY SILLS
  Deputy Pre-Stress Concrete   07/24/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   07/24/2014   Approved   SAKO AGHAZARIAN
  Deputy Shotcrete   07/24/2014   Approved   SAKO AGHAZARIAN
  Deputy Pre-Stress Concrete   07/25/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   07/25/2014   Approved   SAKO AGHAZARIAN
  Deputy Shotcrete   07/25/2014   Approved   SAKO AGHAZARIAN
  Deputy Pre-Stress Concrete   07/28/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   07/28/2014   Approved   SAKO AGHAZARIAN
  Deputy Shotcrete   07/29/2014   Approved   SAKO AGHAZARIAN
  Footing/Foundation/Slab   07/29/2014   Partial Approval   SAKO AGHAZARIAN
  Deputy Shotcrete   07/30/2014   Approved   SAKO AGHAZARIAN
  Footing/Foundation/Slab   07/31/2014   Partial Approval   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   08/01/2014   Approved   SAKO AGHAZARIAN
  Deputy Shotcrete   08/04/2014   Approved   SAKO AGHAZARIAN
  Deputy Shotcrete   08/05/2014   Approved   SAKO AGHAZARIAN
  Footing/Foundation/Slab   08/05/2014   Partial Approval   SAKO AGHAZARIAN
  Deputy Shotcrete   08/06/2014   Approved   SAKO AGHAZARIAN
  Floor/Roof Diaphrgm/Shear Wall   08/06/2014   Partial Approval   SAKO AGHAZARIAN
  Deputy Pre-Stress Concrete   08/07/2014   Approved   SAKO AGHAZARIAN
  Deputy Pre-Stress Concrete   08/08/2014   Approved   MICHAEL KUHN
  Deputy Reinf. Concrete   08/08/2014   Approved   MICHAEL KUHN
  Deputy Pre-Stress Concrete   08/11/2014   Approved   SAKO AGHAZARIAN
  Deputy Pre-Stress Concrete   08/13/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   08/13/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Masonry   08/13/2014   Approved   SAKO AGHAZARIAN
  Deputy Pre-Stress Concrete   08/14/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   08/14/2014   Approved   SAKO AGHAZARIAN
  Footing/Foundation/Slab   08/14/2014   Partial Approval   SAKO AGHAZARIAN
  Deputy Pre-Stress Concrete   08/15/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   08/15/2014   Approved   SAKO AGHAZARIAN
  Deputy Pre-Stress Concrete   08/18/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   08/18/2014   Approved   SAKO AGHAZARIAN
  Deputy Pre-Stress Concrete   08/19/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   08/19/2014   Approved   SAKO AGHAZARIAN
  Footing/Foundation/Slab   08/19/2014   Partial Approval   SAKO AGHAZARIAN
  Deputy Pre-Stress Concrete   08/20/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   08/20/2014   Approved   SAKO AGHAZARIAN
  Deputy Pre-Stress Concrete   08/21/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   08/21/2014   Approved   SAKO AGHAZARIAN
  Deputy Pre-Stress Concrete   08/22/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   08/22/2014   Approved   SAKO AGHAZARIAN
  Footing/Foundation/Slab   08/22/2014   Partial Approval   SAKO AGHAZARIAN
  Deputy Pre-Stress Concrete   08/25/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   08/25/2014   Approved   SAKO AGHAZARIAN
  Deputy Shotcrete   08/25/2014   Approved   SAKO AGHAZARIAN
  Masonry Wall/Backfill   08/25/2014   Partial Approval   SAKO AGHAZARIAN
  Deputy Pre-Stress Concrete   08/26/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   08/26/2014   Approved   SAKO AGHAZARIAN
  Deputy Shotcrete   08/26/2014   Approved   SAKO AGHAZARIAN
  Deputy Pre-Stress Concrete   08/27/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   08/27/2014   Approved   SAKO AGHAZARIAN
  Deputy Shotcrete   08/27/2014   Approved   SAKO AGHAZARIAN
  Deputy Pre-Stress Concrete   08/28/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   08/28/2014   Approved   SAKO AGHAZARIAN
  Deputy Shotcrete   08/28/2014   Approved   SAKO AGHAZARIAN
  Deputy Pre-Stress Concrete   08/29/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   08/29/2014   Approved   SAKO AGHAZARIAN
  Deputy Shotcrete   08/29/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   09/05/2014   Conditional Approval   BARRY SILLS
  Deputy Shotcrete   09/05/2014   Conditional Approval   BARRY SILLS
  Footing/Foundation/Slab   09/05/2014   Partial Approval   BARRY SILLS
  Deputy Reinf. Concrete   09/09/2014   Approved   SAKO AGHAZARIAN
  Deputy Shotcrete   09/10/2014   Approved   SAKO AGHAZARIAN
  Masonry Wall/Backfill   09/10/2014   Partial Approval   SAKO AGHAZARIAN
  Deputy Shotcrete   09/11/2014   Approved   SAKO AGHAZARIAN
  Deputy Shotcrete   09/12/2014   Partial Approval   LESLIE TRUJILLO
  Deputy Pre-Stress Concrete   09/15/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   09/15/2014   Approved   SAKO AGHAZARIAN
  Footing/Foundation/Slab   09/15/2014   Partial Approval   SAKO AGHAZARIAN
  Deputy Pre-Stress Concrete   09/16/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   09/16/2014   Approved   SAKO AGHAZARIAN
  Deputy Pre-Stress Concrete   09/17/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   09/17/2014   Approved   SAKO AGHAZARIAN
  Deputy Pre-Stress Concrete   09/18/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   09/18/2014   Approved   SAKO AGHAZARIAN
  Deputy Pre-Stress Concrete   09/19/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   09/19/2014   Approved   SAKO AGHAZARIAN
  Footing/Foundation/Slab   09/19/2014   Partial Approval   SAKO AGHAZARIAN
  Deputy Pre-Stress Concrete   09/22/2014   Approved   SAKO AGHAZARIAN
  Deputy Seismic Resistance   09/22/2014   Approved   SAKO AGHAZARIAN
  Deputy Pre-Stress Concrete   09/23/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   09/23/2014   Approved   SAKO AGHAZARIAN
  Deputy Pre-Stress Concrete   09/24/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   09/24/2014   Approved   SAKO AGHAZARIAN
  Footing/Foundation/Slab   09/24/2014   Partial Approval   SAKO AGHAZARIAN
  Deputy Pre-Stress Concrete   09/25/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   09/25/2014   Approved   SAKO AGHAZARIAN
  Deputy Pre-Stress Concrete   09/26/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   09/26/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   09/30/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   10/01/2014   Approved   SAKO AGHAZARIAN
  Footing/Foundation/Slab   10/01/2014   Partial Approval   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   10/02/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   10/03/2014   Approved   SAKO AGHAZARIAN
  Footing/Foundation/Slab   10/07/2014   Partial Approval   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   10/08/2014   Approved   SAKO AGHAZARIAN
  Reinforced Concrete Frame   10/08/2014   Partial Approval   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   10/09/2014   Approved   SAKO AGHAZARIAN
  Floor/Roof Diaphrgm/Shear Wall   10/09/2014   Partial Approval   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   10/10/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   10/14/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   10/15/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   10/16/2014   Approved   SAKO AGHAZARIAN
  Drywall Nailing   10/16/2014   Partial Approval   SAKO AGHAZARIAN
  Footing/Foundation/Slab   10/16/2014   Partial Approval   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   10/17/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   10/20/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   10/21/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   10/22/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   10/23/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   10/24/2014   Conditional Approval   BARRY SILLS
  Deputy Reinf. Concrete   10/27/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   10/28/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   10/29/2014   Approved   SAKO AGHAZARIAN
  Footing/Foundation/Slab   10/29/2014   Partial Approval   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   10/30/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   10/31/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   11/04/2014   Approved   SAKO AGHAZARIAN
  Footing/Foundation/Slab   11/04/2014   Partial Approval   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   11/05/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   11/06/2014   Conditional Approval   BARRY SILLS
  Deputy Reinf. Concrete   11/07/2014   Conditional Approval   BARRY SILLS
  Deputy Reinf. Concrete   11/10/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   11/12/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   11/13/2014   Approved   SAKO AGHAZARIAN
  Footing/Foundation/Slab   11/13/2014   Partial Approval   SAKO AGHAZARIAN
  Reinforced Masonry Frame   11/13/2014   Partial Approval   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   11/14/2014   Approved   SAKO AGHAZARIAN
  Reinforced Concrete Frame   11/14/2014   Partial Approval   SAKO AGHAZARIAN
  Deputy Pre-Stress Concrete   11/17/2014   Approved   SAKO AGHAZARIAN
  Reinforced Masonry Frame   11/17/2014   Partial Approval   SAKO AGHAZARIAN
  Deputy Pre-Stress Concrete   11/18/2014   Approved   SAKO AGHAZARIAN
  Deputy Pre-Stress Concrete   11/19/2014   Approved   SAKO AGHAZARIAN
  Deputy Pre-Stress Concrete   11/20/2014   Approved   SAKO AGHAZARIAN
  Deputy Pre-Stress Concrete   11/21/2014   Approved   SAKO AGHAZARIAN
  Deputy Pre-Stress Concrete   11/24/2014   Approved   SAKO AGHAZARIAN
  Footing/Foundation/Slab   11/24/2014   Partial Approval   SAKO AGHAZARIAN
  Deputy Pre-Stress Concrete   11/25/2014   Approved   SAKO AGHAZARIAN
  Reinforced Concrete Frame   11/25/2014   Partial Inspection   SAKO AGHAZARIAN
  Deputy Pre-Stress Concrete   11/26/2014   Approved   SAKO AGHAZARIAN
  Footing/Foundation/Slab   11/26/2014   Partial Approval   SAKO AGHAZARIAN
  Deputy Pre-Stress Concrete   12/01/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   12/01/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   12/02/2014   Approved   SAKO AGHAZARIAN
  Deputy Shotcrete   12/02/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   12/03/2014   Approved   SAKO AGHAZARIAN
  Deputy Shotcrete   12/03/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   12/04/2014   Approved   SAKO AGHAZARIAN
  Deputy Shotcrete   12/04/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   12/05/2014   Approved   SAKO AGHAZARIAN
  Deputy Shotcrete   12/05/2014   Approved   SAKO AGHAZARIAN
  Reinforced Concrete Frame   12/09/2014   Partial Approval   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   12/18/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   12/19/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   12/22/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   12/23/2014   Approved   SAKO AGHAZARIAN
  Footing/Foundation/Slab   12/23/2014   Partial Approval   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   12/24/2014   Approved   SAKO AGHAZARIAN
  Floor/Roof Diaphrgm/Shear Wall   12/24/2014   Partial Inspection   SAKO AGHAZARIAN
  Floor/Roof Diaphrgm/Shear Wall   12/26/2014   Partial Approval   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   12/29/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   12/30/2014   Approved   SAKO AGHAZARIAN
  Footing/Foundation/Slab   12/30/2014   Partial Approval   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   12/31/2014   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   01/02/2015   Conditional Approval   BARRY SILLS
  Floor/Roof Diaphrgm/Shear Wall   01/05/2015   Partial Inspection   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   01/06/2015   Approved   SAKO AGHAZARIAN
  Drywall Nailing   01/06/2015   Partial Approval   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   01/07/2015   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   01/08/2015   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   01/09/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   01/09/2015   Approved   SAKO AGHAZARIAN
  Drywall Nailing   01/09/2015   Partial Approval   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   01/12/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   01/12/2015   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   01/13/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   01/13/2015   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   01/14/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   01/14/2015   Approved   SAKO AGHAZARIAN
  Floor/Roof Diaphrgm/Shear Wall   01/14/2015   Partial Approval   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   01/15/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   01/15/2015   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   01/16/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   01/16/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   01/20/2015   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   01/21/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   01/21/2015   Approved   SAKO AGHAZARIAN
  Footing/Foundation/Slab   01/21/2015   Partial Inspection   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   01/22/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   01/22/2015   Approved   SAKO AGHAZARIAN
  Drywall Nailing   01/22/2015   Partial Approval   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   01/23/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   01/23/2015   Approved   SAKO AGHAZARIAN
  Reinforced Concrete Frame   01/23/2015   Partial Inspection   SAKO AGHAZARIAN
  Floor/Roof Diaphrgm/Shear Wall   01/26/2015   Partial Approval   SAKO AGHAZARIAN
  Deputy Wood Construction   01/27/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   01/28/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   01/29/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   01/30/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   02/02/2015   Conditional Approval   BARRY SILLS
  Floor/Roof Diaphrgm/Shear Wall   02/02/2015   Partial Approval   BARRY SILLS
  Deputy Wood Construction   02/03/2015   Approved   SAKO AGHAZARIAN
  Drywall Nailing   02/03/2015   Partial Inspection   SAKO AGHAZARIAN
  Deputy Wood Construction   02/04/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   02/05/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   02/06/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   02/10/2015   Approved   SAKO AGHAZARIAN
  Floor/Roof Diaphrgm/Shear Wall   02/10/2015   Partial Approval   SAKO AGHAZARIAN
  Deputy Wood Construction   02/11/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   02/12/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   02/13/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   02/17/2015   Approved   SAKO AGHAZARIAN
  Drywall Nailing   02/17/2015   Partial Approval   SAKO AGHAZARIAN
  Deputy Wood Construction   02/18/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   02/19/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   02/20/2015   Approved   SAKO AGHAZARIAN
  Floor/Roof Diaphrgm/Shear Wall   02/20/2015   Partial Approval   SAKO AGHAZARIAN
  Floor/Roof Diaphrgm/Shear Wall   02/24/2015   Partial Approval   SAKO AGHAZARIAN
  Pre-Inspection   02/25/2015   Approved   SAKO AGHAZARIAN
  Floor/Roof Diaphrgm/Shear Wall   03/05/2015   Partial Approval   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   03/09/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   03/09/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   03/10/2015   Approved   SAKO AGHAZARIAN
  Floor/Roof Diaphrgm/Shear Wall   03/10/2015   Partial Approval   SAKO AGHAZARIAN
  Deputy Wood Construction   03/11/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   03/12/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   03/13/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   03/16/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   03/17/2015   Approved   SAKO AGHAZARIAN
  Drywall Nailing   03/17/2015   Partial Approval   SAKO AGHAZARIAN
  Deputy Wood Construction   03/18/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   03/19/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   03/20/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   03/24/2015   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   03/25/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   03/25/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   03/26/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   03/27/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   03/31/2015   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   04/01/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   04/01/2015   Approved   SAKO AGHAZARIAN
  Floor/Roof Diaphrgm/Shear Wall   04/01/2015   Partial Approval   SAKO AGHAZARIAN
  Deputy Wood Construction   04/02/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   04/03/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   04/07/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   04/08/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   04/09/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   04/10/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   04/13/2015   Conditional Approval   BARRY SILLS
  Deputy Wood Construction   04/14/2015   Conditional Approval   WINSTON DUNNING
  Floor/Roof Diaphrgm/Shear Wall   04/14/2015   Partial Inspection   WINSTON DUNNING
  Deputy Wood Construction   04/15/2015   Conditional Approval   BARRY SILLS
  Deputy Wood Construction   04/16/2015   Conditional Approval   BARRY SILLS
  Deputy Wood Construction   04/17/2015   Conditional Approval   BARRY SILLS
  Deputy Wood Construction   04/22/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   04/23/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   04/24/2015   No Access for Inspection   SAKO AGHAZARIAN
  Deputy Wood Construction   04/27/2015   Approved   SAKO AGHAZARIAN
  Drywall Nailing   04/27/2015   Partial Inspection   SAKO AGHAZARIAN
  Deputy Wood Construction   04/28/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   04/29/2015   Approved   SAKO AGHAZARIAN
  Drywall Nailing   04/29/2015   Partial Inspection   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   04/30/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   04/30/2015   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   05/01/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   05/01/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   05/06/2015   Approved   SAKO AGHAZARIAN
  Drywall Nailing   05/06/2015   Partial Inspection   SAKO AGHAZARIAN
  Deputy Wood Construction   05/07/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   05/08/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   05/12/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   05/13/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   05/14/2015   Approved   SAKO AGHAZARIAN
  Drywall Nailing   05/14/2015   Partial Approval   SAKO AGHAZARIAN
  Deputy Wood Construction   05/15/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   05/18/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   05/19/2015   Approved   SAKO AGHAZARIAN
  Deputy Reinf. Concrete   05/20/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   05/20/2015   Approved   SAKO AGHAZARIAN
  Footing/Foundation/Slab   05/20/2015   Partial Approval   SAKO AGHAZARIAN
  Deputy Wood Construction   05/21/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   05/22/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   05/26/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   05/27/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   05/28/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   05/29/2015   Approved   SAKO AGHAZARIAN
  Light Gage Steel Frame   05/29/2015   Partial Approval   SAKO AGHAZARIAN
  Deputy Wood Construction   06/01/2015   Approved   SAKO AGHAZARIAN
  Green Building Rough   06/01/2015   Partial Inspection   ROLLIN GETTLE III
  Deputy Wood Construction   06/02/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   06/03/2015   Conditional Approval   SAKO AGHAZARIAN
  Drywall Nailing   06/03/2015   Partial Inspection   SAKO AGHAZARIAN
  Deputy Wood Construction   06/04/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   06/05/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   06/09/2015   Approved   SAKO AGHAZARIAN
  Drywall Nailing   06/09/2015   Partial Inspection   SAKO AGHAZARIAN
  Deputy Wood Construction   06/10/2015   Approved   SAKO AGHAZARIAN
  Drywall Nailing   06/10/2015   Partial Approval   SAKO AGHAZARIAN
  Deputy Wood Construction   06/11/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   06/12/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   06/16/2015   Conditional Approval   BARRY SILLS
  Deputy Wood Construction   06/17/2015   Conditional Approval   BARRY SILLS
  Green Building Rough   06/17/2015   Partial Approval   ROLLIN GETTLE III
  Deputy Wood Construction   06/18/2015   Conditional Approval   BARRY SILLS
  Deputy Wood Construction   06/19/2015   Partial Approval   WILLIAM GARCIA
  Deputy Wood Construction   06/23/2015   Conditional Approval   BARRY SILLS
  Deputy Wood Construction   06/24/2015   Conditional Approval   WILLIAM THOMPSON
  Deputy Wood Construction   06/25/2015   Conditional Approval   BARRY SILLS
  Deputy Wood Construction   06/26/2015   Conditional Approval   BARRY SILLS
  Deputy Wood Construction   06/29/2015   Approved   SAKO AGHAZARIAN
  Drywall Nailing   06/29/2015   Partial Approval   SAKO AGHAZARIAN
  Deputy Wood Construction   06/30/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   07/01/2015   Approved   SAKO AGHAZARIAN
  Drywall Nailing   07/01/2015   Partial Inspection   SAKO AGHAZARIAN
  Deputy Wood Construction   07/02/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   07/08/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   07/09/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   07/10/2015   Approved   SAKO AGHAZARIAN
  Drywall Nailing   07/10/2015   Partial Approval   SAKO AGHAZARIAN
  Deputy Wood Construction   07/14/2015   Approved   SAKO AGHAZARIAN
  Light Gage Steel Frame   07/14/2015   Partial Approval   SAKO AGHAZARIAN
  Deputy Wood Construction   07/15/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   07/16/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   07/17/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   07/21/2015   Approved   SAKO AGHAZARIAN
  Interior/Exterior Lathing   07/21/2015   Partial Approval   SAKO AGHAZARIAN
  Deputy Wood Construction   07/22/2015   Approved   SAKO AGHAZARIAN
  Drywall Nailing   07/22/2015   Partial Approval   SAKO AGHAZARIAN
  Deputy Wood Construction   07/23/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   07/24/2015   Approved   SAKO AGHAZARIAN
  Drywall Nailing   07/24/2015   Partial Approval   SAKO AGHAZARIAN
  Deputy Wood Construction   07/27/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   07/28/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   07/29/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   07/30/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   07/31/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   08/04/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   08/05/2015   Approved   SAKO AGHAZARIAN
  Green Building Rough   08/05/2015   Partial Approval   ROLLIN GETTLE III
  Light Gage Steel Frame   08/05/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   08/06/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   08/07/2015   Approved   SAKO AGHAZARIAN
  Drywall Nailing   08/07/2015   Partial Approval   SAKO AGHAZARIAN
  Deputy Wood Construction   08/11/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   08/12/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   08/13/2015   Approved   SAKO AGHAZARIAN
  Light Gage Steel Frame   08/13/2015   Partial Inspection   SAKO AGHAZARIAN
  Deputy Wood Construction   08/14/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   08/17/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   08/18/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   08/19/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   08/20/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   08/21/2015   Approved   SAKO AGHAZARIAN
  Light Gage Steel Frame   08/24/2015   Partial Approval   SAKO AGHAZARIAN
  Deputy Wood Construction   08/25/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   08/26/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   08/27/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   08/28/2015   Conditional Approval   TED RIES
  Deputy Wood Construction   09/01/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   09/02/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   09/03/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   09/04/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   09/08/2015   Approved   SAKO AGHAZARIAN
  Light Gage Steel Frame   09/08/2015   Partial Approval   SAKO AGHAZARIAN
  Deputy Wood Construction   09/09/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   09/10/2015   Approved   SAKO AGHAZARIAN
  Deputy Wood Construction   09/11/2015   Approved   SAKO AGHAZARIAN
  Green Building Rough   09/15/2015   Partial Approval   ROLLIN GETTLE III
  Green Building Rough   09/18/2015   Partial Approval   ROLLIN GETTLE III
  Light Gage Steel Frame   09/18/2015   Partial Inspection   GREGORY POMISH
  Drywall Nailing   09/21/2015   Partial Approval   SAKO AGHAZARIAN
  Light Gage Steel Frame   09/23/2015   Partial Approval   SAKO AGHAZARIAN
  Green Building Final   10/05/2015   Partial Approval   ROLLIN GETTLE III
  Light Gage Steel Frame   10/07/2015   Partial Approval   SAKO AGHAZARIAN
  Light Gage Steel Frame   10/20/2015   Partial Approval   SAKO AGHAZARIAN
  Green Building Rough   10/21/2015   Partial Approval   ROLLIN GETTLE III
  Footing/Foundation/Slab   10/28/2015   Partial Approval   SAKO AGHAZARIAN
  Special/Order Compliance   11/09/2015   Partial Approval   SAKO AGHAZARIAN
  Footing/Foundation/Slab   11/30/2015   Partial Approval   SAKO AGHAZARIAN
  Drywall Nailing   12/08/2015   Partial Approval   SAKO AGHAZARIAN
  Light Gage Steel Frame   12/30/2015   Partial Approval   SAKO AGHAZARIAN
  Green Building Final   01/05/2016   Partial Approval   ROLLIN GETTLE III
  Light Gage Steel Frame   01/11/2016   Partial Approval   SAKO AGHAZARIAN
  T-Bar Ceiling   01/14/2016   Partial Inspection   SAKO AGHAZARIAN
  T-Bar Ceiling   01/21/2016   Partial Inspection   SAKO AGHAZARIAN
  Light Gage Steel Frame   02/02/2016   Partial Inspection   SAKO AGHAZARIAN
  Light Gage Steel Frame   02/09/2016   Partial Inspection   SAKO AGHAZARIAN
  Light Gage Steel Frame   02/11/2016   Partial Inspection   SAKO AGHAZARIAN
  Light Gage Steel Frame   02/16/2016   Partial Approval   SAKO AGHAZARIAN
  Drywall Nailing   02/18/2016   Partial Inspection   SAKO AGHAZARIAN
  Green Building Final   02/18/2016   Partial Approval   MICKEY YAMASHITA
  Green Building Final   02/23/2016   Partial Inspection   MICKEY YAMASHITA
  Light Gage Steel Frame   02/24/2016   Approved   SAKO AGHAZARIAN
  Light Gage Steel Frame   02/25/2016   Approved   SAKO AGHAZARIAN
  Structural Steel Frame   02/26/2016   Approved   SAKO AGHAZARIAN
  Drywall Nailing   02/29/2016   Partial Approval   SAKO AGHAZARIAN
  Drywall Nailing   03/02/2016   Partial Inspection   SAKO AGHAZARIAN
  Drywall Nailing   04/05/2016   Partial Inspection   SAKO AGHAZARIAN
  Light Gage Steel Frame   05/18/2016   Approved   SAKO AGHAZARIAN
  Light Gage Steel Frame   06/01/2016   Approved   SAKO AGHAZARIAN
  Green Building Final   06/24/2016   Corrections Issued   MICKEY YAMASHITA
  Final   06/28/2016   Partial Inspection   SAKO AGHAZARIAN
  Footing/Foundation/Slab   06/28/2016   Approved   SAKO AGHAZARIAN
  Green Building Final   06/28/2016   Not Ready for Inspection   MICKEY YAMASHITA
  Green Building Rough   06/28/2016   Not Ready for Inspection   MICKEY YAMASHITA
  Reinforced Concrete Frame   06/28/2016   Approved   SAKO AGHAZARIAN
  Reinforced Masonry Frame   06/28/2016   Approved   SAKO AGHAZARIAN
  SGSOV-Seismic Gas S/O Valve   06/28/2016   SGSOV Approved   SAKO AGHAZARIAN
  SUSMP-Std. Urban Storm Water   06/28/2016   Approved   SAKO AGHAZARIAN
  Smoke Detectors   06/28/2016   Approved   SAKO AGHAZARIAN
  Light Gage Steel Frame   07/11/2016   Approved   SAKO AGHAZARIAN
  Drywall Nailing   07/13/2016   Approved   SAKO AGHAZARIAN
  Green Building Final   07/13/2016   Approved   MICKEY YAMASHITA
  Green Building Rough   07/13/2016   Approved   MICKEY YAMASHITA
  Drywall Nailing   08/23/2016   Approved   SAKO AGHAZARIAN
  Final   08/24/2016   OK to Issue CofO   SAKO AGHAZARIAN